Phase 2 competitive threat, dual-facility challenge, and operating-system redesign
Describe the competitive threat from offshore bids, the business case for keeping Medtronic work at Phase 2, and the lean redesign used to absorb added volume from another facility through cells, kanban, hourly replenishment, flexible staffing, and reduced kitting.