Fire-Service Mission-Critical Activity, Qualitative BIA, and Risk Strategies
From: Business Continuity and Project Management
Mission-Critical Activity
In the study material, the organization is a fire brigade, and one of its mission-critical activities is fire safety. It is treated as mission-critical because fire creates major risks for businesses: it can kill or injure visitors and employees and can damage or destroy buildings, stock, and equipment. The material says the organization identifies and manages these risks through attention to common fire-related hazards, fire safety precautions, fire safety training, and fire safety legislation. Source: [Business Continuity and Project Management](material:51)
Qualitative Business Impact Analysis (BIA)
The material describes a qualitative BIA based on risk assessment matrices in which frequencies and consequences are described qualitatively. The assessment depends on two terms: hazard and exposure. Source: [Business Continuity and Project Management](material:51)
Hazard / Exposure Matrix
- Hazard: either present (1) or not present (0).
- Exposure levels: classified from Level 1 to Level 3.
Exposure Levels
- Level 1: goods and property.
- Level 2: people who can be harmed.
- Level 3: possible deaths, goods destroyed, and people injured.
The material notes that some of the questions asked in the assessment are based on the hazard or the exposure level. Source: [Business Continuity and Project Management](material:51)
Risk Strategies for Structure Fires
The study material presents three structure-fire risk strategies: moderate risk, significant risk, and maximum risk. Each strategy specifies personnel deployment, responding units, arrival-time targets, and a performance objective. Source: [Business Continuity and Project Management](material:51)
1. Structure Fire: Moderate Risk
- Personnel deployed: 17.
- Units: 3 engine companies, 1 rescue company, 1 medic unit, and 1 battalion chief.
- Arrival target: first units within 6 minutes total reflex time for 90% of requests.
- Remaining-unit target: within 10 minutes total reflex time for 90% of requests.
- Objective: stop escalation of moderate fire when found.
2. Structure Fire: Significant Risk
- Personnel deployed: 23.
- Units: 4 engine companies, 2 truck companies, 1 rescue company, 1 medic unit, and 2 battalion chiefs.
- Arrival target: first units within 6 minutes for 90% of emergency-service requests.
- Second-engine / first-due-truck target: within 10 minutes total reflex time for 90% of requests.
- Remaining-unit target: battalion chiefs within 14 minutes total reflex time for 90% of requests.
- Objective: stop escalation of serious fires in places found.
3. Structure Fire: Maximum Risk
- Personnel deployed: 34.
- Units: 5 engine companies, 2 truck companies, 1 rescue company, 2 medic units, and 2 battalion chiefs.
- Arrival target: first units within 6 minutes total reflex time for 90% of requests.
- Second-engine / first-due-truck target: within 10 minutes total reflex time for 90% of requests.
- Remaining-unit target: battalion chiefs within 16 minutes total reflex time for 90% of requests.
- Objective: stop escalation of maximum fire in places found.
Business Continuity Strategy
The material states that the adopted business continuity strategy is the BIA methodology. It uses assessments that outline criteria needed to enable preparedness for emergencies that may disrupt the business or organization internally or externally. The material adds that this can be considered in day-to-day terms or in terms of personnel. Source: [Business Continuity and Project Management](material:51)
Key Takeaway
In the indexed study material, fire safety is mission-critical because of its threat to people and property. The qualitative BIA simplifies assessment through hazard presence and three exposure levels, while the response strategies scale personnel, apparatus, and arrival-time targets according to the seriousness of the structure-fire risk. Source: [Business Continuity and Project Management](material:51)